The proscenium and backdrop are the two elements Scenic Designer Rob Johnson lays out ground plans for when beginning to create a set. He takes 2 months to design before his plans go to the technical director for 6 weeks of construction. This is followed by a week’s worth of painting and technical rehearsals. Overall, the entire design process typically takes about 3 to 4 months before a set is ready for production. During this time, changes are constantly being made to the design. This scene originally had a revolving door as part of the construction plan before the decision was made to edit it out.
Zandi Jotia
Sophie Smith | April 24Otterbein student Zandi Jotia said FAFSA is confusing, has too many questions, and is repetitive.
Vobeyball players passing a volleyball before the eclpise 2024
Ruby Jackson | April 19Two Otterbein student athletes spending the time before the eclipse playing volleyball.
Student expert at the Otterbein Totality Eclpise Party of 2024
Ruby Jackson | April 19Otterbein student and RA volunteering as a student expert for the 'Otterbein Totality Eclipse Party'