Skip to Content, Navigation, or Footer.
Aselya Sposato ·

The proscenium and backdrop are the two elements Scenic Designer Rob Johnson lays out ground plans for when beginning to create a set. He takes 2 months to design before his plans go to the technical director for 6 weeks of construction. This is followed by a week’s worth of painting and technical rehearsals. Overall, the entire design process typically takes about 3 to 4 months before a set is ready for production. During this time, changes are constantly being made to the design. This scene originally had a revolving door as part of the construction plan before the decision was made to edit it out. 

More


Today's Lineup
12:00-12:00am Alternative
Newscast
Weekly Where and When 3.25.wav Transcript
The Chirp
This field is required.
Powered by SNworks Solutions by The State News
All Content © 2024 T&CMedia